Transbay Transit Center Project Tour

On the tour you will get a unique opportunity to see history in the making. The Transbay Transit Center Project is a visionary transportation project that transforms downtown San Francisco and the San Francisco Bay Area’s regional transportation system by creating a “Grand Central Station of the West”. The project replaces the former Transbay Terminal at First and Mission Streets in San Francisco with a modern regional transit hub connecting eight Bay Area counties and the State of California through 11 transit systems: AC Transit, BART, Caltrain, Golden Gate Transit, Greyhound, Muni, SamTrans, WestCAT Lynx, Amtrak, Paratransit and future High Speed Rail from San Francisco to Los Angeles/Anaheim. Phase one, construction of the Transit Center, has been underway since 2009 and will open to the public for bus service in 2018. The Transit Center is a 1 million square foot inside the 5 story facility with a 5.4 acre city park located on its highest level. The roof top park includes features such as an amphitheater, restaurants, playground, and fountains in addition to a wide variety of natural beauty via signature landscaping design. The park will be accessible by the public from a variety of options ranging from stairs, escalators, and elevators to a gondola on Mission Street and sky bridges from adjacent high rise towers. The cable stay bridge, connecting the bay bridge to the Transit Center’s elevate bus deck level is also a part of phase 1 construction which will provide bus access to the facility. Phase 2, not under construction at this time, will ultimately provide the train service associated tunnels, platforms, and rails which will allow CalTrain and California High Speed Rail to access the station.

Owner: Transbay Joint Powers Authority (TJPA)

Contractor: Webcor Obayashi Joint Venture (WOJV)

Date: Friday. June 23, 2017

Time: 10:00am to 12:00pm

Location: The WOJV Jobsite Trailer complex (175 Beale Street, San Francisco). Enter the gate in the green site fence on the East side of Beale street just to the south of 201 Mission. The gate is identified with general access/visitor entrance signage. Walk up to the deck to your right and then into the conference trailer to your left (look for the A, B, C signage and enter any of those doors).

Cost: Free for EERI NC Chapter Members

RSVP/Registration Details: email chapterinfo@eeri.org to RSVP by June 14, 2017

About the Tour

Your tour host is Webcor Obayashi Joint Venture (WOJV), the General Contractor / Construction Manager on the project. The event will start with a presentation on the project and a 1 hour job site tour. On the walking tour please be aware the project being 4 blocks long will require a great deal of walking and climbing stairs maybe required. For the sake of time, the 1 hour walking tour will include the main spaces on the ground level, bus deck and roof top park all which will open to the public in 2018. The tour will not include the spaces for the future train service which are below ground nor back of house areas.

Preparing for your Visit

Remember to dress for success. Visitors not attired correctly will not be allowed on site for Safety reasons. You will need to provide at minimum for yourself the following:

  • Long pants
  • Shirt or outerwear with a minimum 3” sleeve
  • Work / Hiking boots (ankle covered, thick soled, closed toe, no heel)

Personal Protective Equipment (PPE)

WOJV will provide you with a visitor’s waiver for you to review and sign. Then WOJV will issue you the following PPE (personal protective equipment) for use on your tour. These items should be returned at the completion of your visi.

  • Safety Vest
  • Safety Glasses
  • Safety Gloves
  • Hard Hat

Learn More about the project at:

About the project: http://transbaycenter.org/project/program-overview

Virtual Fly Through: http://transbaycenter.org/interactive

TTC Program Overview (YouTube): https://www.youtube.com/watch?v=QEf9HNGOAdY

EERI Northern California Chapter | c/o EERI National | 499 14th Street Suite 320 | Oakland, CA 94612-1934 USA | chapterinfo@eerinc.org